2G ID Card GPS Tracker – Real-Time Location Tracking | SOS Alerts Compact & Lightweight
2G ID Card GPS Tracker – Real-Time Location Tracking | SOS Alerts Compact & Lightweight
2G ID Card GPS Tracker – Real-Time Location Tracking | SOS Alerts Compact & Lightweight
2G ID Card GPS Tracker – Real-Time Location Tracking | SOS Alerts Compact & Lightweight
2G ID Card GPS Tracker – Real-Time Location Tracking | SOS Alerts Compact & Lightweight
2G ID Card GPS Tracker – Real-Time Location Tracking | SOS Alerts Compact & Lightweight

2G ID Card GPS Tracker – Real-Time Location Tracking | SOS Alerts Compact & Lightweight

1 customer reviews

Key Features (Bullet Points)

  • Exohive Digital's ID Card GPS Tracker with 2 Way Communication, Panic Button GPS Device.

Here’s a clean, sharp feature list you can use anywhere:

• Built-in GPS tracking with real-time location updates
• 2-way communication for instant calling between user and guardian
• Dedicated panic/SOS button for emergency alerts
• Slim ID-card design for schools, offices, and personal safety
• No installation required — ready to use out of the box
• Geo-fencing alerts for safe zone entry/exit
• Route history and playback to review movement
• Low-battery alerts for uninterrupted safety
• Compatible with Android and iOS tracking apps

Brand: Exohive Digital™

Available in store | Stock: 300 units
In Stock

Purchase of Year:

₹6,000.00 ₹5,000.00
OFF
10 Days Replacement
Free Delivery
Cash/Pay on Delivery
Secure Transaction
  • Description
  • Additional Information
  • Reviews (1)

Introducing the Exohive Digital™ 2G ID Card Tracker GPS Device – your all-in-one solution for safety, security, and peace of mind.
Whether you want to protect loved ones, secure valuables, or track assets, this compact device delivers powerful tracking capabilities with ease.

📍 Track Anything, Anytime – Place it in a bag, attach it to clothing, or hide it in valuable items to monitor their location in real-time via a simple mobile app.

💡 Perfect For:

  • Child Safety – Keep tabs on your kids and ensure their safety at school or outdoors.
  • Elderly Care – Monitor elderly family members who may need assistance.
  • Asset Protection – Safeguard bikes, laptops, luggage, or any valuable item.
  • Pet Tracking – Ensure your pets never wander too far.
  • Outdoor Activities – Track routes while jogging, cycling, or hiking.

📦 What’s Included:

  • 1 × Exohive Digital™ 2G ID Card GPS Tracker Device
  • Pre-activated SIM Card (1-year data & SMS plan)
  • 1-Year GPS Tracking Software Subscription
  • Warranty Card (1 Year, T&C Apply)

💰 Renewal Charges: ₹1799/year for app subscription & SIM data pack.

With the Exohive Digital™ 2G ID Card Tracker, you’re always just a tap away from knowing exactly where your loved ones or valuables are — anytime, anywhere.

Â

Dash Cam (Full HD, Real-Time Tracking)

The Exohive Digital™ Dash Cam is the ultimate vehicle security and monitoring device for car owners, fleet managers, and travel enthusiasts. This innovative 2-in-1 dash camera + GPS tracker not only records your journeys in Full HD 1080p but also provides real-time location tracking with advanced security alerts – all accessible from your smartphone via a powerful mobile app.

Whether you want proof in case of accidents, 24/7 vehicle monitoring, or driver behavior tracking, this dash cam is your reliable road companion.

Â

Premium Features:

  • Full HD 1080p Video Recording – Crystal-clear video quality ensures every road detail is captured, even at night.
  • 4G LTE Connectivity – Watch live footage and access recordings instantly, anywhere in the world.
  • GPS Tracking with Live Updates – Pinpoint your vehicle’s exact location every 10 seconds for ultimate security.
  • Dual Use – Dash Cam + GPS Tracker – Get the benefits of both in one compact device.
  • Mobile App Integration – Control, view, and manage your device from Android or iOS smartphones.
  • Security Alerts – Get instant notifications for overspeed, movement, or unauthorized vehicle use.
  • Easy Installation – Sleek and discreet design, perfect for personal and commercial vehicles.

Â

Why Exohive Digital™ Dash Cam Stands Out:

  • 📌 For Families: Keep your loved ones safe during travel and have video proof in emergencies.
  • 📌 For Businesses: Track fleets, monitor drivers, and protect against theft or misuse.
  • 📌 For Solo Travelers: Record scenic drives and store memories while staying secure.

Â

Technical Specifications:

  • Video Resolution: 1920×1080p Full HD
  • Connectivity: 4G LTE, WiFi
  • GPS Accuracy: <5 meters
  • Storage: Supports microSD (up to 128GB)
  • Alerts: Overspeed, Towing, Ignition, Movement
  • Compatibility: Android & iOS

Â

Package Includes:

  • 1 × Exohive Digital™ Dash Cam
  • 1 × Power Cable
  • 1 × Mounting Kit
  • 1 × User Manual

Â

🚗 Drive Safer. Smarter. More Secure.
Order your Exohive Digital™ Dash Cam today and experience peace of mind on every journey!

Â

Â

1 Reviews

Raj

Raj Sep 30, 2025 at 8:46 AM

Add a review

Rate this product?

Go Back Top